Bilbao LNG Terminal

bilbao 1

 

Project Name : BILBAO LNG Terminal

Country : Spain

Project Location : Bilbao

Name of the Client : Bilbao Bizkaia Gas Consortium
(British Petroleum, Repsol, Iberdrola, Eve)

Contract Period : 2000 – 2003

Scope of Work : SofreGaz in joint-venture with SN Technigaz and Initec EPC LSTK : EPCC

 

Project Description          

  • Capacity: 2.7 billion Nm3/year,
  • Gas grid send-out: 267,000 Nm3/hour,
  • Power station send-out: 133,000 Nm3/hour.

 

Equipment

  • LNG storage tanks: 2 x 150,000 m3,
  • Cryogenics pumps: LP in-tank LNG pumps, (8 x 265 m3/hour), HP LNG pumps (4 x 243 m3/hour),
  • Vaporizers: open-rack type (2 x 200,000 Nm3/hour) submerged type (1 x 200,000 Nm3/hour),
  • Boil-off gas: reciprocating compressors 2 x 2,741 Nm3/hour,
  • Utilities: sea water system, air, electrical power, nitrogen …,
  • Auxiliaries: Flare and shutdown systems, unloading and transfer facilities, 3 x 16" LNG unloading arms and 1 x 16" vapor return arm, jetty for 135,000 m3 LNG tankers.