Krk Island - CROATIA - LNG TERMINAL - FEED
ADRIA LNG awarded SOFREGAZ an ENGINEERING SUPPORT SERVICES & FRONT END ENGINEERING DESIGN contract for the LNG terminal project located on the Krk Island, in Croatia. This contract completes the Conceptual engineering study prepared by SOFREGAZ in 2007.
This project comprises three phases:
- Phase 1 : Review and « Endorsement » of existing documents
- Phase 2 : Assistance to ADRIA LNG in the obtaining of the « Location Permit ».
- Phase 3 : Feed for the LNG terminal

