HAINAN - CHINA - LNG RECEIVING TERMINAL
Start of the FEED project on the LNG receiving terminal on the Chinese Hainan Island.
Project comprises 2 steps:
- a conceptual design including a review of the existing Feasibility Study Report
- FEED including the EPC tender preparation
The start-up is scheduled for 2014, the terminal should be equipped with two tanks and a send-out capacity of 2.0 MPTA.

