Gas Condensate Treatment Plant Wafa
Client:AGIP GAS BV
Location:Wafa LIBYA Contract
Period:2002 – 2005
In partnership with Tecnimont [Italy] & JGC [Japan]. SOFREGAZ part (10%)Scope of work: Lump Sum Turn Key EPC Commissioning & Start-up
Expected production levels are the following:
Sales gas: 4.44 BSCM/Y (~ 10 BSCM/Y including NC-41)
Liquid products: 60,600 SBPD stabilized oil / 13,200 SBPD liquid propane
Duration: Overall project execution schedule for the above-described Wafa project is 32 months from the contract award